Now anticipated cost overrun of delayed central sector projects in the surface transport sector

Annual · INR billion · 1995–2024 · Published by India — Reserve Bank of India

Latest · 2024

2,355.77 INR billion

up +1,336.4667 INR billion vs 2023

Ten-year high
2,355.77 INR billion · 2024
Ten-year low
110.95 INR billion · 2014

INR billion

Use this series in your AI

Use FactIQ to chart rbi::rbi|6ede4c25155dc3cc over the last ten years, with its latest value and the change over the past year.

Paste into an AI model with FactIQ connected. How to connect

About this series

This series tracks the currently anticipated cost overruns for delayed central sector infrastructure projects specifically within the surface transport sector. The data is part of the industrial statistics provided by the Reserve Bank of India and reflects the total additional expenditure expected beyond the original budget for these projects. (Footnote: Notes : 1. Data relate to central sector projects costing Rupees 100 crore and above up to 2010. From 2011 onwards data pertain to projects costing Rupees 150 crore and above. 2. Projects without date of commissioning are not considered. 3. Cost overrun is taken as the difference between the 'anticipated cost' and the 'original cost'. 4.Surface transport = Road transport + Shipping & ports. 5.Others = Heavy Industry+ Defence Production + Health & family welfare + Urban Development. Source : Ministry of Statistics and Programme Implementation, Government of India.)

Series ID
rbi::rbi|6ede4c25155dc3cc
Frequency
Annual
Units
INR billion
Coverage
1995 – 2024
Now anticipated cost overrun of delayed central sector projects in the surface transport sector: 2,355.77 INR billion for 2024 · FactIQ