Total cost overrun of delayed central sector projects in the surface transport sector
Annual · INR billion · 1995–2024 · Published by India — Reserve Bank of India
Latest · 2024
451.2 INR billion
up +224.7838 INR billion vs 2023
- Ten-year high
- 451.2 INR billion · 2024
- Ten-year low
- 19.41 INR billion · 2015
INR billion
Use this series in your AI
Use FactIQ to chart rbi::rbi|6ece3388b2e01b24 over the last ten years, with its latest value and the change over the past year.
The same rows through the SQL tool of the FactIQ plugin or MCP connector.
SELECT time, value
FROM rbi.data_points
WHERE series_id = 'rbi|6ece3388b2e01b24'
ORDER BY time;About this series
This series tracks the total cost overrun, measured in Indian Rupee billions, for delayed central sector projects specifically within the surface transport sector. The data is part of industrial statistics and is reported on an annual basis to monitor budget deviations in major infrastructure projects. (Footnote: Notes : 1. Data relate to central sector projects costing Rupees 100 crore and above up to 2010. From 2011 onwards data pertain to projects costing Rupees 150 crore and above. 2. Projects without date of commissioning are not considered. 3. Cost overrun is taken as the difference between the 'anticipated cost' and the 'original cost'. 4.Surface transport = Road transport + Shipping & ports. 5.Others = Heavy Industry+ Defence Production + Health & family welfare + Urban Development. Source : Ministry of Statistics and Programme Implementation, Government of India.)
- Series ID
- rbi::rbi|6ece3388b2e01b24
- Frequency
- Annual
- Units
- INR billion
- Coverage
- 1995 – 2024