Original estimated cost of delayed central sector projects in the surface transport sector
Annual · INR billion · 1995–2024 · Published by India — Reserve Bank of India
Latest · 2024
1,904.56 INR billion
up +1,111.6829 INR billion vs 2023
- Ten-year high
- 1,904.56 INR billion · 2024
- Ten-year low
- 88.43 INR billion · 2014
INR billion
Use this series in your AI
Use FactIQ to chart rbi::rbi|1c2509af325d15d7 over the last ten years, with its latest value and the change over the past year.
The same rows through the SQL tool of the FactIQ plugin or MCP connector.
SELECT time, value
FROM rbi.data_points
WHERE series_id = 'rbi|1c2509af325d15d7'
ORDER BY time;About this series
This series tracks the original estimated cost for delayed central sector projects specifically within the surface transport sector. The data is part of industrial statistics and provides a baseline for understanding cost overruns in major infrastructure projects. It is reported annually and is not seasonally adjusted. (Footnote: Notes : 1. Data relate to central sector projects costing Rupees 100 crore and above up to 2010. From 2011 onwards data pertain to projects costing Rupees 150 crore and above. 2. Projects without date of commissioning are not considered. 3. Cost overrun is taken as the difference between the 'anticipated cost' and the 'original cost'. 4.Surface transport = Road transport + Shipping & ports. 5.Others = Heavy Industry+ Defence Production + Health & family welfare + Urban Development. Source : Ministry of Statistics and Programme Implementation, Government of India.)
- Series ID
- rbi::rbi|1c2509af325d15d7
- Frequency
- Annual
- Units
- INR billion
- Coverage
- 1995 – 2024