Original estimated cost of delayed central sector projects in the power sector

Annual · INR billion · 1995–2024 · Published by India — Reserve Bank of India

Latest · 2024

715.05 INR billion

down −68.4617 INR billion vs 2023

Ten-year high
2,275.93 INR billion · 2018
Ten-year low
715.05 INR billion · 2024

INR billion

Use this series in your AI

Use FactIQ to chart rbi::rbi|082aad63ca5f9bb1 over the last ten years, with its latest value and the change over the past year.

Paste into an AI model with FactIQ connected. How to connect

About this series

This series tracks the original cost estimates for central sector power projects that have experienced delays. It is part of the industrial statistics dataset and provides a baseline for understanding cost overruns in the power industry. The data is reported annually and is measured in billions of Indian Rupees. (Footnote: Notes : 1. Data relate to central sector projects costing Rupees 100 crore and above up to 2010. From 2011 onwards data pertain to projects costing Rupees 150 crore and above. 2. Projects without date of commissioning are not considered. 3. Cost overrun is taken as the difference between the 'anticipated cost' and the 'original cost'. 4.Surface transport = Road transport + Shipping & ports. 5.Others = Heavy Industry+ Defence Production + Health & family welfare + Urban Development. Source : Ministry of Statistics and Programme Implementation, Government of India.)

Series ID
rbi::rbi|082aad63ca5f9bb1
Frequency
Annual
Units
INR billion
Coverage
1995 – 2024
Original estimated cost of delayed central sector projects in the power sector: 715.05 INR billion for 2024 · FactIQ