Amount of infrastructure financing for railway tracks including electrical and signaling systems, tunnels, viaducts, and bridges by Punjab National Bank within the non-scheduled Small Finance Bank Group
Quarterly · INR billion · 2022–2025 · Published by India — Reserve Bank of India
Latest · Q3 2025
21.7227 INR billion
down −1.3906 INR billion vs Q2 2025
down −16.2451 INR billion vs Q3 2024
- High since 2022
- 39.5513 INR billion · Q2 2024
- Low since 2022
- 21.4446 INR billion · Q2 2022
INR billion
Use this series in your AI
Use FactIQ to chart rbi::rbi|008e90458ab8a72e over the last ten years, with its latest value and the change over the past year.
The same rows through the SQL tool of the FactIQ plugin or MCP connector.
SELECT time, value
FROM rbi.data_points
WHERE series_id = 'rbi|008e90458ab8a72e'
ORDER BY time;About this series
This series tracks the total value of infrastructure financing provided by Punjab National Bank for railway projects, specifically covering railway tracks, electrical and signaling systems, tunnels, viaducts, and bridges. The data is categorized under the non-scheduled Small Finance Bank Group and is part of the Reserve Bank of India's banking performance indicators for infrastructure financing items.
- Series ID
- rbi::rbi|008e90458ab8a72e
- Frequency
- Quarterly
- Units
- INR billion
- Coverage
- Q2 2022 – Q3 2025