Alaska Refinery Catalytic Hydrotreating Diesel Downstream Charge Capacity as of January 1

Annual · Barrels per Stream Day · 2006–2026 · Published by Energy Information Administration

Latest · 2026

23,500 Barrels per Stream Day

up +12,000 Barrels per Stream Day vs 2025

Ten-year high
23,500 Barrels per Stream Day · 2026
Ten-year low
11,500 Barrels per Stream Day · 2016

Barrels per Stream Day

Use this series in your AI

Use FactIQ to chart eia::PET.8_NA_8CDHDD_SAK_5.A over the last ten years, with its latest value and the change over the past year.

Paste into an AI model with FactIQ connected. How to connect

About this series

This series represents the annual measurement of the catalytic hydrotreating diesel downstream charge capacity at refineries in Alaska, recorded as of January 1 each year. It provides insight into the processing capacity of diesel fuel through catalytic hydrotreating units in the region's refineries.

Series ID
eia::PET.8_NA_8CDHDD_SAK_5.A
Frequency
Annual
Units
Barrels per Stream Day
Coverage
2006 – 2026
Dataset
Petroleum Data
Alaska Refinery Catalytic Hydrotreating Diesel Downstream Charge Capacity as of January 1: 23,500 Barrels per Stream Day for 2026 · FactIQ