Actual Net Electricity Interchange from California ISO to Nevada Power Company (Hourly, Local Time)
Hourly · megawatthours · Published by Energy Information Administration
Actual Net Electricity Interchange from California ISO to Nevada Power Company (Hourly, Local Time)
Updated 20 Nov 2026
Category | Actual Net Electricity Interchange from California ISO to Nevada Power Company (Hourly, Local Time) |
|---|
Showing 0 to 0 of 0 entries
Use this series in your AI
Use FactIQ to chart eia::EBA.CISO-NEVP.ID.HL over the last ten years, with its latest value and the change over the past year.
Paste into an AI model with FactIQ connected. How to connect
The same rows through the SQL tool of the FactIQ plugin or MCP connector.
SQL
SELECT time, value
FROM eia.data_points
WHERE series_id = 'EBA.CISO-NEVP.ID.HL'
ORDER BY time;About this series
This series represents the actual net electricity interchange measured hourly (local time) from the California Independent System Operator (ISO) to Nevada Power Company (NEVP). It tracks the flow of electricity between these two entities on an hourly basis.
- Series ID
- eia::EBA.CISO-NEVP.ID.HL
- Frequency
- Hourly
- Units
- megawatthours
- Dataset
- Electric Balancing Authority (EBA) Data