Total trip duration in minutes for docked bikeshare rides ending at the S 27th Street and Tunnel Boulevard station in Pittsburgh, Pennsylvania
Monthly · trips; minutes; proportion · 2019–2021 · Published by Bureau of Transportation Statistics
Latest · December 2021
1,886 trips; minutes; proportion
down −279 trips; minutes; proportion vs November 2021
up +1,294 trips; minutes; proportion vs December 2020
- High since 2019
- 25,383 trips; minutes; proportion · July 2020
- Low since 2019
- 592 trips; minutes; proportion · December 2020
trips; minutes; proportion
Use this series in your AI
Use FactIQ to chart bts::w3m5-t2w3:00250c493eb1 over the last ten years, with its latest value and the change over the past year.
The same rows through the SQL tool of the FactIQ plugin or MCP connector.
SELECT time, value
FROM bts.data_points
WHERE series_id = 'w3m5-t2w3:00250c493eb1'
ORDER BY time;About this series
This series represents the total number of minutes spent on docked bikeshare trips that ended at the S 27th St & Tunnel Blvd (Southside Works) station in Pittsburgh, Pennsylvania. The data is part of the Healthy Ride system, which rebranded to POGOH in 2022. The total trip time is calculated for all trips ending at this specific station (ID 1045) and can be divided by the number of trips to determine the average trip duration. The dataset excludes trips shorter than one minute or longer than two hours and is designed to help analyze ridership trends, including the impacts of the COVID-19 pandemic.
- Series ID
- bts::w3m5-t2w3:00250c493eb1
- Frequency
- Monthly
- Units
- trips; minutes; proportion
- Coverage
- January 2019 – December 2021
- Dataset
- Docked Bikeshare Ridership by System, Year, Month, and End Station